Armstrong Chemicals logo Armstrong Chemicals The Engineer's Choice Talk to an expert
Home / Solutions / Damp-proof course
Solutions · Walls and foundations

Damp-Proof Course and Foundation Waterproofing: Stop Ground Moisture at the Plinth

A damp-proof course is the waterproof band at plinth level that stops ground moisture rising into the walls. In new construction it is a course of mortar or concrete dosed with CONPROOF LW 200, CONPROOF No. 1 or CONPROOF 500, and the footings and foundation walls are coated with ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 and RAINSEAL BMW 250 before backfilling. In an existing wall with no DPC, RAINSEAL BXL bituminous paste is packed into a chase. Most damp at the base of walls comes from a DPC that has been bridged. Start with the checks below.

By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982

Section 1 of 10: Start here
1
Stage
New build or existing house
2
Level
Where the DPC line sits
3
Barrier
Build it, coat the foundation
4
Keep clear
Nothing bridges it later
Step 1

Damp-proof course: what it is and where it goes

A damp-proof course, or DPC, is a continuous waterproof band built into every wall at plinth level. Brick, mortar and concrete are full of fine pores that draw ground moisture upward. The damp proof course is the one layer that water cannot climb past. Below it sit the footings and foundation walls, which stay in contact with wet soil for the life of the building and are coated before the soil goes back. It is a small job at plinth stage, and it decides whether the walls above stay dry. It is also the hardest waterproofing to add later. Five checks tell you what your building needs.

123456OutsideInside1 Damp-proof course across thefull wall thickness at plinth level2 At least 150 mm above thefinished ground outside3 Foundation wall coated on thesoil side before backfilling4 Footing5 Inside floor at or below the DPC,never bridging over it6 Plinth protection slopingaway from the wall
The damp-proof course at plinth level, the coated foundation wall below it, and the ground and floor levels that must not bridge it.
1

What stage is the building at?

At foundation and plinth stage everything is open and the work is simple. In a finished house the wall has to be cut to put a DPC in, so every other cause is ruled out first.

2

Is there a DPC already?

In an existing house look for a thicker dark or cement band in the wall just above ground level, outside and inside. Building drawings or the original contractor can confirm it.

3

Where is the ground level against it?

Measure from the DPC line down to the soil or paving outside. If the ground has risen to the line or above it, the DPC is bridged.

4

Is plaster or flooring carried across it?

Outside plaster run down to the ground, or an inside floor, screed or skirting raised above the DPC, gives water a path around it.

5

Is any part of the building below ground?

A basement, cellar, sump or lift pit holds back soil and water. That is waterproofing against pressure, which a DPC alone does not provide.

Step 2

Find the right DPC and foundation waterproofing route

Match your building to one route. Each route says what is done and takes you to its section.

Route A

New house at plinth stage

A damp-proof course is laid across every wall at plinth level, in mortar or concrete dosed with an integral waterproofing compound.
Route B

Footings and foundation walls, before backfill

The faces that will touch the soil are repaired and coated while they can still be reached.
Route C

Existing house, damp band, DPC present

The DPC is usually bridged, not failed. The bridges are found and removed. Often this is the whole cure.
Route D

Existing wall with no DPC

Only after bridging, rain and leaks are ruled out: a new damp-proof course is cut into the wall in short sections. This is the last resort.
Route E

Basement, cellar or pit

Walls and floors below ground need a full waterproofing system. The foundation section points you to the right page.
Not sure

Let the finder suggest a route

Answer three questions and see a starting recommendation.

Build it once, then keep it clear. A damp-proof course rarely fails on its own. It is beaten by soil, paving, plaster and floors that are later raised past it.

Get the right damp-proof course for your building

Tell us whether the building is new or existing, the wall thickness and what the ground is like. An Armstrong applicator or distributor will recommend the DPC and foundation system. Toll free 1800 103 2034. Armstrong manufactures damp-proof course chemicals and foundation waterproofing coatings in Bengaluru and supplies them all across India, with South India as its major hub.

Send us a Message
About this guide

Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.

The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.

Last updated · Questions on this method: toll free 1800 103 2034

Related solutions
Wall dampness treatment Efflorescence treatment External wall waterproofing New construction waterproofing Basement waterproofing Waterproof concrete All solutions →
Call usTalk to an expert