Armstrong Chemicals logo Armstrong Chemicals The Engineer's Choice Talk to an expert
Home / Solutions / Lift pit waterproofing
Solutions · Lift pits

Lift Pit Waterproofing: Stop the Water, Do Not Just Pump It

Lift pit waterproofing stops water entering the lowest point of the building. The Armstrong system has three parts. Running entry points are stopped with RAPIDSTRONG GROUT PU injection or RAPIDSTRONG PLUG 31. Cold joints and honeycombs are repaired with ROOFEX GP, ROOFCRETE AR or ROOFCRETE MC 240. The pit floor and walls are then lined in two coats of ROOFEX COP crystalline coating, or of ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 where movement is expected. A pump alone only removes water that has already entered.

By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982

Section 1 of 10: Start here
1
Check
Water, timing, entry points
2
Route
Match your pit
3
Stop and repair
Inject, plug, rebuild
4
Line and test
Two coats, cure, watch
Step 1

Water in the lift pit: check these five things first

Standing water at the bottom of the lift shaft, a pump that runs after every rain, rust on the buffers and guide rails, a damp line at the pit floor and wall joint, and lift faults in the monsoon are the usual signs of lift pit leakage. The pit is the lowest point of the building. It is cast as a step below the basement raft, so water held in the soil after rain drains towards it and presses on its walls and floor before it reaches anything else. Lift pit waterproofing means stopping that water where it enters. Five checks decide the lift pit leakage solution.

A pump is not waterproofing. A pump removes water that is already inside the pit. It does not stop it entering, it stops in a power cut, and the pit walls stay wet and under pressure between pump runs. Keep the pump as a backup. The fix is to close the entry points and line the pit.
Lift car123456Basement floorWet soilWet soil1 Raft and pit wall joint2 Pit floor and wall joint3 Buffer anchor holes4 Honeycombed concrete5 Cracks in the pit walls6 Pipe and conduit entriesWhere a lift pit leaks
A lift pit is a small concrete box set below the basement floor, with more joints for its size than any other part of the building. Each numbered point is treated before the lining goes on.
1

Does the water return after pumping?

Pump the pit dry and watch. If the level comes back within hours, water is coming through the concrete. If it stays dry until someone washes the floor above, the source is inside the building.

2

Does it follow the rain?

Water that returns a day or two after heavy rain is storm water held in the soil around the pit. Water all year points to a wet site, a leaking water line or a drain nearby. Check both.

3

Is water running in, or seeping?

A trickle or jet at one point is stopped first. Seepage along a joint or through the wall is injected or repaired. Mark each one while the pit is wet.

4

Where does it enter?

Look at the joint between the raft and the pit wall, the pit floor and wall joint, the holes where the buffers are anchored, honeycombed concrete, cracks and conduit entries.

5

What are the pit walls made of?

Most pits are RCC. Some older pits have brick or stone walls, which need a lining that suits masonry.

Step 2

Find the right lift pit waterproofing method

Match your pit to one route. Site work in a lift pit is done by an Armstrong applicator or distributor with the lift taken out of service by the lift company.

Route A

Water is running in at a point or a joint

The flow is stopped first. A point is plugged and a running joint or crack is injected with a water-reactive grout.
Route B

Standing water that returns after pumping

Every entry path is found, injected and repaired, then the whole pit is lined in two coats.
Route C

Damp walls and floor, no standing water

The joints and any honeycombs are repaired and the pit is lined before the problem grows.
Route D

Brick or stone pit walls

The walls are stripped and repaired, then lined with a coating that suits masonry.
Route E

New lift pit being built

Watertight concrete, treated joints and a lining before the lift is installed.
Route F

Lined before and flooding again

Find the missed path and the source of the water before anything is re-coated.
Not sure

Let the finder suggest a route

Answer three questions and see a starting recommendation.

Stop the water. Do not just pump it. Entry points first, repairs second, lining last, on every route.

Get the right waterproofing system for your lift pit

Tell us the pit size, when the water appears and where it enters. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures lift pit waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub.

Send us a Message
About this guide

Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.

The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.

Last updated · Questions on this method: toll free 1800 103 2034

Related solutions
Basement waterproofing Retaining wall waterproofing Injection grouting Waterproof concrete New construction waterproofing All solutions →
Call usTalk to an expert