Lift pit waterproofing stops water entering the lowest point of the building. The Armstrong system has three parts. Running entry points are stopped with RAPIDSTRONG GROUT PU injection or RAPIDSTRONG PLUG 31. Cold joints and honeycombs are repaired with ROOFEX GP, ROOFCRETE AR or ROOFCRETE MC 240. The pit floor and walls are then lined in two coats of ROOFEX COP crystalline coating, or of ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 where movement is expected. A pump alone only removes water that has already entered.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Standing water at the bottom of the lift shaft, a pump that runs after every rain, rust on the buffers and guide rails, a damp line at the pit floor and wall joint, and lift faults in the monsoon are the usual signs of lift pit leakage. The pit is the lowest point of the building. It is cast as a step below the basement raft, so water held in the soil after rain drains towards it and presses on its walls and floor before it reaches anything else. Lift pit waterproofing means stopping that water where it enters. Five checks decide the lift pit leakage solution.
Pump the pit dry and watch. If the level comes back within hours, water is coming through the concrete. If it stays dry until someone washes the floor above, the source is inside the building.
Water that returns a day or two after heavy rain is storm water held in the soil around the pit. Water all year points to a wet site, a leaking water line or a drain nearby. Check both.
A trickle or jet at one point is stopped first. Seepage along a joint or through the wall is injected or repaired. Mark each one while the pit is wet.
Look at the joint between the raft and the pit wall, the pit floor and wall joint, the holes where the buffers are anchored, honeycombed concrete, cracks and conduit entries.
Most pits are RCC. Some older pits have brick or stone walls, which need a lining that suits masonry.
Match your pit to one route. Site work in a lift pit is done by an Armstrong applicator or distributor with the lift taken out of service by the lift company.
Stop the water. Do not just pump it. Entry points first, repairs second, lining last, on every route.
Tell us the pit size, when the water appears and where it enters. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures lift pit waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034
Lift pit waterproofing stops water entering the lowest point of the building. The Armstrong system has three parts. Running entry points are stopped with RAPIDSTRONG GROUT PU injection or RAPIDSTRONG PLUG 31. Cold joints and honeycombs are repaired with ROOFEX GP, ROOFCRETE AR or ROOFCRETE MC 240. The pit floor and walls are then lined in two coats of ROOFEX COP crystalline coating, or of ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 where movement is expected. A pump alone only removes water that has already entered.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Standing water at the bottom of the lift shaft, a pump that runs after every rain, rust on the buffers and guide rails, a damp line at the pit floor and wall joint, and lift faults in the monsoon are the usual signs of lift pit leakage. The pit is the lowest point of the building. It is cast as a step below the basement raft, so water held in the soil after rain drains towards it and presses on its walls and floor before it reaches anything else. Lift pit waterproofing means stopping that water where it enters. Five checks decide the lift pit leakage solution.
Pump the pit dry and watch. If the level comes back within hours, water is coming through the concrete. If it stays dry until someone washes the floor above, the source is inside the building.
Water that returns a day or two after heavy rain is storm water held in the soil around the pit. Water all year points to a wet site, a leaking water line or a drain nearby. Check both.
A trickle or jet at one point is stopped first. Seepage along a joint or through the wall is injected or repaired. Mark each one while the pit is wet.
Look at the joint between the raft and the pit wall, the pit floor and wall joint, the holes where the buffers are anchored, honeycombed concrete, cracks and conduit entries.
Most pits are RCC. Some older pits have brick or stone walls, which need a lining that suits masonry.
Match your pit to one route. Site work in a lift pit is done by an Armstrong applicator or distributor with the lift taken out of service by the lift company.
Stop the water. Do not just pump it. Entry points first, repairs second, lining last, on every route.
Answer three questions for a starting recommendation, then confirm it with an Armstrong expert. Every lining shown suits the pit described.
{{ resWhy }}
Before any product goes on, the pit is pumped out and all loose, old and flaking material is removed back to sound concrete. This is a starting point, and an Armstrong expert confirms the final choice after seeing the site.
Every product below suits this job. Pick the one that fits the site, or ask an Armstrong expert to choose with you.
When water leaks, seeps or sweats through porous, honeycombed or cracked concrete, it has to be stopped inside the concrete first. This is the standard negative-side method for tanks, pools, basements, lift pits and retaining walls. A lining laid over concrete that is still seeping is pushed off by the water behind it: it blisters, lifts and fails. Grouting through drilled holes fills the internal voids and capillaries along the path of the water, so the surface is dry and sound before the coating or membrane goes on. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
The work is done inside the pit with the lift isolated. The pit is pumped dry, cleaned of silt and oil, and everything loose is removed back to sound concrete. Only then can the entry points be seen. A lift pit has a short list of places where water gets in, and each has its own treatment.
Product quantities, mixing and the injection method for these materials are on the basement waterproofing and injection grouting pages.
With the entry points closed, the pit is lined as one box: the floor, the fillet and four walls, without a break at the corners. On a finished building only the inside can be reached, so the lining is a negative side lining and must not be a paint that water can lift from behind. The right lining depends on the state of the pit.
A new lift pit is the easiest pit to keep dry, because the concrete, the joints and the outside faces can all be treated before the lift arrives. Most leaking pits were cast in a cramped excavation, poorly compacted and left untreated at the joint with the raft.
A pit that takes in water after treatment has usually been lined without all its entry points being closed, or it is being fed by a source that was never looked at. Work up the ladder one rung at a time. Breaking out and recasting the pit is the extreme case and comes last.
The Armstrong materials are the same. The pit is not the same job, because it is small, deep and full of equipment.
Approximate quantities for a pit 8 ft long, 7 ft wide and 5 ft deep. The floor is 56 sq.ft and the four walls come to 150 sq.ft, a total of 206 sq.ft or about 19 sq.m. Figures are worked out from each product's stated coverage. Injection grout, plugging compound and repair mortar depend on the leaks found and are measured at site. An Armstrong expert confirms the final quantity after seeing the site.
Enter the size of the pit to see the lining needed for the floor and four walls. Quantities only. Injection grout, plugging compound and repair mortar depend on the leaks found and are measured at site.
This is an estimate of material only, worked out from each product's stated coverage on a smooth, prepared surface. Rough or porous surfaces use more, so allow about 10% extra. Crack sealing, patch repair, plaster, coving and tiling materials are not included. An Armstrong expert confirms the final quantity after seeing the site.
Three kinds are used together. RAPIDSTRONG GROUT PU or RAPIDSTRONG PLUG 31 stops water at the entry points. ROOFEX GP and repair mortar close the joints and honeycombs. The pit is then lined in two coats with a crystalline coating such as ROOFEX COP, or with ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 where movement is expected.
Because the pit is the lowest point of the building. Water held in the soil after rain drains towards it and presses on its floor and walls first. The rest of the basement can be dry while the pit fills.
No. A pump takes out water that has already come in. It does not stop it entering, it stops when the power fails, and the walls stay wet between runs. Keep it as a backup after the pit is sealed.
Yes. The lift company isolates the lift and protects the equipment in the pit before work starts, and refits it afterwards. The time out of service depends on the leaks found and the curing of the lining, and is agreed with the applicator and the lift company before work starts.
Pump out and clean the pit, mark where water enters, plug point leaks, inject running joints and cracks with a water-reactive grout, rebuild the joints and honeycombs, form a fillet at the floor and wall joint, then line the floor and walls in two coats and moist cure.
Yes. On an existing building the pit can only be reached from inside. Injection closes the paths and a crystalline lining seals the concrete from within.
A crystalline lining keeps reacting whenever the concrete gets wet, and injection closes the paths the water used. The pit is watched through wet weather before the equipment is refitted, and any point that shows damp is re-injected.
Both are used. A crystalline coating such as ROOFEX COP, ROOFEX or ROOFEX 2K 711 suits a sound RCC pit. ROOFCOAT FLEXI 100 and ROOFBOND RFX PLUS 210 are flexible cementitious linings with 120%+ elongation and suit a pit with cracks or expected movement. An Armstrong expert confirms the choice.
The materials are the same. The pit is deeper, tighter, has more joints for its size and holds lift equipment. See basement waterproofing for the cellar as a whole.
Yes. ROOFEX 2K 711 is compatible with brick and stone masonry under negative pressure. The walls are stripped of plaster and repaired first.
RAPIDSTRONG GROUT PU or RAPIDSTRONG GROUT PFC 79 where water is running, because they react with the water in 36 to 48 seconds. RAPIDSTRONG GROUT VM 99 or ROOFEX GP where the joint must be filled and bonded. See injection grouting.
With an integral compound such as CONPROOF LW 200 in the concrete, treated construction joints, grouted anchor holes and a lining in two coats before the lift is installed.
A drainage sump is. A sump that stores water for use is lined as a water tank. See water tank waterproofing.
Tell us the pit size, when the water appears and where it enters. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures lift pit waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034