Waterproofing for New House Construction: What to Do at Each Stage

Waterproofing for new house construction is done stage by stage, before each part is covered. CONPROOF LW 200, CONPROOF 500 or CONPROOF No. 1 goes into the concrete and plaster. RAINSEAL BMW 250 coats the footings. ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 goes under bathroom tiles, inside the water tank and on the terrace slab, and an elastomeric coating finishes the terrace and outside walls. Find your stage below and follow it.

By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982

Section 1 of 10: Start here
1
Plan
List the stages before work starts
2
Build it in
Compound in concrete and plaster
3
Coat and test
Membrane, then a water test
4
Finish
Walls, terrace top coats, paint
Step 1

Waterproofing for new house construction: check where the building stands

Waterproofing for new house construction is not one job at the end. It is a short task at each stage: the foundation before it is backfilled, the concrete as it is mixed, the bathrooms before tiling, the terrace before the screed, the walls before paint. Each stage is covered by the next one, so each has to be done and checked at its own time. This page lists the waterproofing steps for a new building, the Armstrong product used at each stage, and the detailed page for each area. Six checks tell you where to start.

12345671 Footings and foundation, coatedbefore backfilling2 Damp-proof course at plinth level3 Sump, basement or lift pit4 Bathrooms, before tiling5 External walls: waterproof plaster,then an elastomeric coating6 Terrace: membrane on the slab,screed, then the top coats7 Overhead water tank, lined insideIntegral compound goes into theconcrete and plaster at every stage
Seven places a new house is waterproofed. Each one is closed by the next stage of work, so each is treated and tested before that happens.
1

Has the foundation been backfilled?

Footings and the earth face of basement and retaining walls can only be coated while they are still open. After backfilling, only the inside face can be reached.

2

Is the concrete mixed at site or ready-mix?

Site-mixed concrete takes the integral compound in the gauging water, bag by bag. Ready-mix takes it in the transit mixer at site.

3

Is there a sump, basement or lift pit?

Anything that holds water or sits in ground water needs more than the compound in the concrete. Plan its lining before the slab above closes the access.

4

Are the bathrooms tiled yet?

Before tiling, the full sequence goes on the bare slab and is tested with water. After tiling, the choices are fewer.

5

Is the terrace screed laid?

The membrane goes on the roof slab, under the screed. Once the screed is down, the terrace is coated from the top.

6

Are the outside walls plastered and painted?

The waterproofing compound goes into the plaster, and the elastomeric coating goes on before the colour coat.

Why now

Waterproofing during construction is far simpler than repair later

Engineers describe the effect of waiting with the Law of Fives (De Sitter, 1984). One unit spent on doing the job properly during construction saves about five units of maintenance once problems begin, 25 units of repair once damage spreads, and 125 units of major rehabilitation.

1 ×
During construction: compound in the mix, membrane under the finish.
5 ×
First damp patches: maintenance after the finishes are on.
25 ×
Leaks and rusting steel: tiles, screed and plaster opened for repair.
125 ×
Spalled concrete: structural repair of slabs and walls.
Step 2

Find the waterproofing steps for your stage of construction

Match the building to one route. Each route tells you what is done at that stage and takes you to its section.

Route A

Foundation, plinth, basement or sump still open

Dense concrete, a coating on the faces that will be buried, a damp-proof course at plinth level, and the lining for anything that holds water.
Route B

Slabs, columns and walls going up

An integral waterproofing compound in every bag of cement, then curing for at least seven days.
Route C

Bathrooms, balconies and the water tank, not yet tiled

Pipe sleeves, joints, cove and two coats of membrane, tested with water before any tile is laid.
Route D

Terrace and external walls

Membrane on the roof slab, screed to slope, top coats, then waterproof plaster and an elastomeric coating on the walls.
Route E

A stage was closed without waterproofing

Most of it can still be put right from the accessible face. Breaking open finished work is the last option.
Route F

I want the whole list for my contractor

One table, stage by stage, with the product, the check and the detailed page for each.
Not sure

Let the finder suggest a starting point

Answer three questions about the stage, the area and the concrete.

Waterproof each stage before the next one covers it. A membrane that is tested and then covered works for the life of the finish above it. One that is skipped can only be reached by breaking that finish.

Get the right waterproofing for every stage of your new building

Tell us the stage of construction, the built-up area and whether there is a basement or sump. An Armstrong applicator or distributor will recommend the products for each stage. Toll free 1800 103 2034. Armstrong manufactures waterproofing chemicals for new construction in Bengaluru and supplies them all across India, with South India as its major hub.

Send us a Message
About this guide

Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.

The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.

Last updated · Questions on this method: toll free 1800 103 2034

Related solutions
Waterproof concrete Basement waterproofing Terrace waterproofing Bathroom waterproofing Damp-proof course Lift pit waterproofing All solutions →
Related guides
Building with Armstrong
Call usTalk to an expert