Machine foundation grouting fills the gap under a base plate so the load passes evenly into the concrete, and anchoring fixes the bolts that hold it down. The Armstrong system is chosen by load, gap and exposure: RAPIDSTRONG GROUT POWDER (GP2) non shrink grout for static base plates and column bases, RAPIDSTRONG GROUT EP 403 epoxy grout for vibrating machinery and chemical areas, ROOFCRETE EP for deep pours, and RAPIDSTRONG AG, RAPIDSTRONG GROUT AG PRIDE or ROOFBOND EPP 504 for anchor bolts and rebar.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
A machine, a steel column or a crane rail does not sit directly on concrete. It is levelled on packers or jack bolts, and the gap under the base plate is then filled with grout. The grout is the load path. If it shrinks away from the plate, leaves air pockets or breaks up under vibration, the bolts loosen, the alignment drifts and the foundation cracks. That is why a base plate is grouted with a non shrink grout and not with ordinary cement mortar, which shrinks as it dries. Armstrong makes cementitious precision grout, epoxy grout, grout additives and chemical anchor grouts for bolts and rebar. Three decisions pick the right one: the load, the gap and the exposure.
A steel column base or a tank is a static load. A compressor, pump, press, turbine or crane rail vibrates, reciprocates or takes impact. Dynamic loads decide between cementitious and epoxy grout.
Measure the gap between the foundation and the underside of the plate at several points. Under 10 mm, 10 to about 70 or 100 mm, and deeper pours each take a different grout or mix.
Lubricating oil, coolant, plating solution, acid or alkali spillage attack cementitious grout over time. Chemical exposure points to epoxy.
Foundation bolts in pockets or drilled holes, starter bars and dowels are fixed with an anchor grout before or with the base plate grouting.
Drilled holes that hold water and anchors below water need a grout made for it.
Early strength differs widely between the grouts. Know the restart date before choosing.
Match the job to one route. Each route names the Armstrong products made for it and takes you to its section. Where several products suit, all are listed, and an Armstrong expert helps you pick.
Prepare first, pour once, pour from one side. All loose concrete, laitance, old grout, oil and flaking material is removed before any grout is mixed.
Tell us the plate size, the gap, the type of machine and the bolts to be fixed. An Armstrong applicator or distributor will recommend a grout. Toll free 1800 103 2034. Armstrong manufactures machine grouting and anchoring chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034
Machine foundation grouting fills the gap under a base plate so the load passes evenly into the concrete, and anchoring fixes the bolts that hold it down. The Armstrong system is chosen by load, gap and exposure: RAPIDSTRONG GROUT POWDER (GP2) non shrink grout for static base plates and column bases, RAPIDSTRONG GROUT EP 403 epoxy grout for vibrating machinery and chemical areas, ROOFCRETE EP for deep pours, and RAPIDSTRONG AG, RAPIDSTRONG GROUT AG PRIDE or ROOFBOND EPP 504 for anchor bolts and rebar.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
A machine, a steel column or a crane rail does not sit directly on concrete. It is levelled on packers or jack bolts, and the gap under the base plate is then filled with grout. The grout is the load path. If it shrinks away from the plate, leaves air pockets or breaks up under vibration, the bolts loosen, the alignment drifts and the foundation cracks. That is why a base plate is grouted with a non shrink grout and not with ordinary cement mortar, which shrinks as it dries. Armstrong makes cementitious precision grout, epoxy grout, grout additives and chemical anchor grouts for bolts and rebar. Three decisions pick the right one: the load, the gap and the exposure.
A steel column base or a tank is a static load. A compressor, pump, press, turbine or crane rail vibrates, reciprocates or takes impact. Dynamic loads decide between cementitious and epoxy grout.
Measure the gap between the foundation and the underside of the plate at several points. Under 10 mm, 10 to about 70 or 100 mm, and deeper pours each take a different grout or mix.
Lubricating oil, coolant, plating solution, acid or alkali spillage attack cementitious grout over time. Chemical exposure points to epoxy.
Foundation bolts in pockets or drilled holes, starter bars and dowels are fixed with an anchor grout before or with the base plate grouting.
Drilled holes that hold water and anchors below water need a grout made for it.
Early strength differs widely between the grouts. Know the restart date before choosing.
Match the job to one route. Each route names the Armstrong products made for it and takes you to its section. Where several products suit, all are listed, and an Armstrong expert helps you pick.
Prepare first, pour once, pour from one side. All loose concrete, laitance, old grout, oil and flaking material is removed before any grout is mixed.
Armstrong makes cementitious precision grout, epoxy grouts, grout additives and chemical anchor grouts. Every one is a sound choice for its job. Answer three questions for a starting recommendation, then confirm it with an Armstrong expert and the machine supplier.
{{ resWhy }}
Before any grout goes in, remove all loose concrete, laitance, old grout, oil and flaking material. This is a starting point, and an Armstrong expert confirms the final choice after seeing the site.
Every product below suits this job. Pick the one that fits the site, or ask an Armstrong expert to choose with you.
This sequence applies to a new installation, whichever grout is used. The work is done by the erection contractor or an Armstrong applicator. The steps show what a proper job looks like.
For static loads and general structural bedding, the standard choice is a bagged cementitious precision grout. RAPIDSTRONG GROUT POWDER (GP2) is a ready-to-use powder of Portland cement, bonding additives and inert fillers. Water is the only thing added at site, so there is no batching error. A gas-producing additive expands the grout slightly while it is still plastic, which makes up for shrinkage and settlement and keeps the grout tight under the plate. It contains no metallic iron and no added chlorides.
Where grout is batched at site from cement, Armstrong additives make it free-flowing and non-shrink. These suit bolt pockets, bedding, duct grouting and void filling, and base plates where the engineer accepts a site mix.
An epoxy grout is used where a cementitious grout would be worked loose or eaten away: reciprocating machinery, mobile loads, testing equipment, heavy crane and transporter rails and high-speed turbines, and in steel works, refineries, electroplating shops and chemical plants where spillage reaches the base. RAPIDSTRONG GROUT EP 403 is a two-component, low-viscosity, free-flow epoxy grout conforming to ASTM C-881-78. It is non-shrink, has low creep under sustained load and resists repeated dynamic load.
ROOFCRETE EP is a three-part, solvent-free structural epoxy concrete and machine mortar. The kit holds the epoxy resin base, the amine hardener and graded quartz silica aggregate. It is made for deep pours with a gap of 10 to 75 mm under vibrating equipment, crane rails, bridge bearing seats and anchor blocks. It reaches 93 N/mm² in compression and 21 N/mm² in flexure at 7 days, with a tensile strength of 14 N/mm², bonds to concrete at above 4 N/mm² and has a pot life of 90 to 120 minutes. The foundation is primed with ROOFBOND EP, mixed base to hardener at 65:35 by volume and covering 2 to 2.5 sq.m per kg, and the epoxy concrete is placed while the primer is still tacky, within 30 to 50 minutes. Tools are cleaned with acetone only.
A chemical anchor fixes a bolt or a bar into hardened concrete or rock. A hole is drilled, a resin grout is poured in and the bolt is pressed into it. The resin fills the space around the bolt and bonds it to the concrete. It is used for foundation bolts and machinery base plates, crane rails, starter bars and extension bars for new concrete, load-bearing anchorages for equipment and structures, and rock bolts in tunnels and mines. Armstrong makes three anchor grouts. All three suit bolts and bars, so pick by the site conditions or ask an Armstrong expert.
Bolts cast in pockets, and not in drilled holes, are grouted with a free-flowing non-shrink grout: RAPIDSTRONG GROUT POWDER (GP2), or cement grout made with RAPIDSTRONG GROUT ADMIX or RAPIDSTRONG GROUT PB 66. Starter bars for column jacketing and concrete extensions are covered on the structural concrete repair page. Exposed bolts and steelwork are protected as shown on the steel rust protection page.
Rising vibration, bolts that will not stay tight, a hollow sound under the plate, cracked grout shoulders and oil seeping from under the base are signs that the grout has failed. The usual causes are a grout that shrank, voids left by trapped air, mortar used in place of grout, and oil or chemicals that broke down a cementitious grout. Repair is the first choice. Lifting the machine and rebuilding the foundation is the last resort.
Every product below is a sound choice for the job it is made for. They differ in chemistry, in the gap they fill and in the loads and exposure they are made for. Figures are from Armstrong data sheets and brochures.
Grout is ordered by volume: plate length multiplied by width multiplied by the gap. The example is a base plate 1.2 m long and 0.6 m wide with a 50 mm gap, which is 36 litres, and four 20 mm bolts in 32 mm holes drilled 200 mm deep. The hole size is an example for the arithmetic, not a recommendation. Add the grout shoulder outside the plate and an allowance for wastage. Figures are worked out from each product's stated yield or density. An Armstrong expert confirms the final quantity after seeing the site.
Enter the plate size and the gap to get the grout volume and the material for the grout you choose. Enter the bolts to get the anchor grout. Quantities only.
This is an estimate of material only, worked out from each product's stated coverage on a smooth, prepared surface. Rough or porous surfaces use more, so allow about 10% extra. Crack sealing, patch repair, plaster, coving and tiling materials are not included. An Armstrong expert confirms the final quantity after seeing the site.
For static loads, a non-shrink cementitious precision grout such as RAPIDSTRONG GROUT POWDER (GP2). For vibrating or reciprocating machinery and where oil or chemicals reach the base, an epoxy grout such as RAPIDSTRONG GROUT EP 403. For deep pours under heavy equipment, ROOFCRETE EP. Bolts are fixed with RAPIDSTRONG AG, RAPIDSTRONG GROUT AG PRIDE or ROOFBOND EPP 504.
A grout that does not lose volume as it hardens. RAPIDSTRONG GROUT POWDER (GP2) expands 3 to 4% while still plastic, which makes up for shrinkage and settlement, so it stays in full contact with the underside of the plate.
The one that fits the load and the exposure. Cementitious grout suits static loads and is simple to mix and place. Epoxy grout suits vibration, impact and chemical spillage and gains strength faster. An Armstrong expert confirms the choice.
For RAPIDSTRONG GROUT POWDER (GP2), add 3.76 litres of water per 20 kg bag for a flowable mix, or 3.36 litres for a pourable mix. Nothing else is added for pours up to 100 mm.
Clean the foundation and the plate, level the column on shims, fix leak-proof formwork with the pouring side raised, dampen the concrete, mix RAPIDSTRONG GROUT POWDER (GP2) with measured water, pour from one side without a break until grout shows on the far side, and cure the shoulders for 7 days.
Under a plate, RAPIDSTRONG GROUT POWDER (GP2) goes in a single pour up to 100 mm, and deeper with 10 mm aggregate. RAPIDSTRONG GROUT EP 403 fills 0.1 to 10 mm as resin and hardener, 10 to 70 mm with filler, and over 70 mm with filler and aggregate. ROOFCRETE EP is stated for 10 to 75 mm.
It depends on the grout and the temperature. RAPIDSTRONG GROUT EP 403 with filler at 1:3 reaches 72 N/mm² in one day. RAPIDSTRONG AG reaches 70 N/mm² in one day. For cementitious grout, ask Armstrong for the early-age strength and follow the machine supplier's requirement.
Drill the hole to the depth fixed with Armstrong or the design engineer, clean it of dust and oil, pour in the mixed anchor grout, press the bolt to the bottom so the resin fills around it, and leave it undisturbed until set.
The depth depends on the bolt diameter, the load and the concrete, so Armstrong asks that the embedment and hole size be fixed with its technical representative. As a reference, the tested case is a 20 mm bolt embedded 200 mm in RAPIDSTRONG AG, where the bolt broke at 11 tonnes before the grout slipped.
Yes. Starter bars and extension bars are anchored in drilled holes with RAPIDSTRONG AG or RAPIDSTRONG GROUT AG PRIDE. The bar size, spacing and depth come from the structural engineer.
Yes. RAPIDSTRONG AG is stated for wet and underwater conditions, and ROOFBOND EPP 504 is a pourable epoxy for wet, underwater and chemical zones.
Work out the volume of the hole and subtract the volume of the bolt, then add for wastage. 1 kg of RAPIDSTRONG AG gives 0.5 litres of mixed grout. The calculator on this page does the arithmetic.
Yes. RAPIDSTRONG GROUT ADMIX at 250 g per 50 kg of cement, added to the mixing water first, gives a free-flowing grout with 1 to 4% expansion. A bagged precision grout removes batching errors and is preferred under critical base plates.
Usually because the grout under the plate has shrunk, cracked or broken down, so the plate moves under load. Check for a hollow sound and cracked shoulders. The base is then injected or regrouted, and the bolts are re-fixed.
Armstrong states that RAPIDSTRONG GROUT EP 403 resists oil, grease, fats, most chemicals, mild acids and alkalis, fresh water and sea water. For solvents or concentrated chemicals, consult Armstrong first.
Tell us the plate size, the gap, the type of machine and the bolts to be fixed. An Armstrong applicator or distributor will recommend a grout. Toll free 1800 103 2034. Armstrong manufactures machine grouting and anchoring chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034