Concrete spalling repair deals with ceiling concrete that falls and shows rusted rods, and with cracked or broken columns, beams and chajjas. The order never changes: treat the steel, bond, then rebuild. For a spalled ceiling the Armstrong system is ROOFBOND EP primer, ALSTRONG ZP 777 on the steel and ROOFCRETE EP as the repair mortar. Columns, beams and chajjas are also rebuilt with ROOFCRETE AR or ROOFCRETE AR 576 polymer mortar, and large sections with micro concrete. A structural engineer assesses load-bearing members first.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Ceiling plaster falling in chunks with the iron rods visible, rust stains running down a column, a chajja with its edge broken off, cracks along the line of the bars in a beam: all of these are the same problem at different stages. The steel inside the concrete is rusting, and rust takes up more room than the steel it replaces. The pressure cracks the cover concrete and finally pushes it off. This is concrete spalling. Replastering over it hides the rods for a season or two, and then the patch falls again, because the steel underneath is still rusting. Concrete spalling repair works only in one order: treat the steel, bond, then rebuild the concrete.
Tap the surface with a hammer for a metre around what you can see. A hollow sound means the cover has already separated. Spalling almost always extends beyond the visible patch.
Are the rods only surface-rusted, or are they pitted, thinner or broken? Thinned or snapped bars are an engineer's decision, not a repair mortar's.
A ceiling slab, a beam, a column, a chajja or a balcony edge. Diagonal cracks, sagging or a leaning member mean stop and call the engineer.
A shallow patch to the depth of the cover, a deep pocket, or a whole face of a column. The depth decides between repair mortar and micro concrete.
A leaking bathroom above, a terrace, a pipe, sea air or an industrial atmosphere. If the source stays, the rust returns.
Damp concrete, chemical exposure and repairs below water each change the mortar.
Match the damage to one route. Each route names the Armstrong products used for it and takes you to its section. Where more than one mortar suits the job, all of them are listed.
Treat the steel, then rebuild the concrete. All loose, hollow and flaking concrete and old plaster comes off first, back to sound material. Repair is always the first choice. Breaking out and recasting a member is the last resort, for concrete with no sound material left.
Tell us which member is damaged, how large the area is and whether the rods are exposed. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures concrete spalling repair chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034
Concrete spalling repair deals with ceiling concrete that falls and shows rusted rods, and with cracked or broken columns, beams and chajjas. The order never changes: treat the steel, bond, then rebuild. For a spalled ceiling the Armstrong system is ROOFBOND EP primer, ALSTRONG ZP 777 on the steel and ROOFCRETE EP as the repair mortar. Columns, beams and chajjas are also rebuilt with ROOFCRETE AR or ROOFCRETE AR 576 polymer mortar, and large sections with micro concrete. A structural engineer assesses load-bearing members first.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Ceiling plaster falling in chunks with the iron rods visible, rust stains running down a column, a chajja with its edge broken off, cracks along the line of the bars in a beam: all of these are the same problem at different stages. The steel inside the concrete is rusting, and rust takes up more room than the steel it replaces. The pressure cracks the cover concrete and finally pushes it off. This is concrete spalling. Replastering over it hides the rods for a season or two, and then the patch falls again, because the steel underneath is still rusting. Concrete spalling repair works only in one order: treat the steel, bond, then rebuild the concrete.
Tap the surface with a hammer for a metre around what you can see. A hollow sound means the cover has already separated. Spalling almost always extends beyond the visible patch.
Are the rods only surface-rusted, or are they pitted, thinner or broken? Thinned or snapped bars are an engineer's decision, not a repair mortar's.
A ceiling slab, a beam, a column, a chajja or a balcony edge. Diagonal cracks, sagging or a leaning member mean stop and call the engineer.
A shallow patch to the depth of the cover, a deep pocket, or a whole face of a column. The depth decides between repair mortar and micro concrete.
A leaking bathroom above, a terrace, a pipe, sea air or an industrial atmosphere. If the source stays, the rust returns.
Damp concrete, chemical exposure and repairs below water each change the mortar.
Match the damage to one route. Each route names the Armstrong products used for it and takes you to its section. Where more than one mortar suits the job, all of them are listed.
Treat the steel, then rebuild the concrete. All loose, hollow and flaking concrete and old plaster comes off first, back to sound material. Repair is always the first choice. Breaking out and recasting a member is the last resort, for concrete with no sound material left.
Armstrong makes rebar coatings, polymer and epoxy bond coats, polymer-modified and epoxy repair mortars, micro concretes and an underwater epoxy mortar. Every one is a sound choice for its job. Answer three questions for a starting recommendation, then confirm it with an Armstrong expert and, for load-bearing members, a structural engineer.
{{ resWhy }}
Before any product goes on, remove all loose, hollow and flaking concrete and plaster back to sound material. This is a starting point, and an Armstrong expert confirms the final choice after seeing the site.
Every product below suits this job. Pick the one that fits the site, or ask an Armstrong expert to choose with you.
Every structural concrete repair starts the same way, whatever mortar goes on afterwards. The concrete is opened until the steel is sound, and the steel is cleaned and protected before any cover goes back. Patching over cleaned but unprotected steel is why many repaired spalls reappear within a few monsoons.
Armstrong makes three coatings for rusted reinforcement. Each suits this job, so pick by the state of the steel and the system that follows, or ask an Armstrong expert.
When concrete has spalled and the rods are showing, the repair has to deal with the corroded steel first and the concrete second. The order below protects the steel, bonds the new mortar to the old concrete and cures it so it reaches full strength. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
A spalled ceiling is the hardest place to make a repair hold. The mortar is applied overhead, the slab above may still be damp from a bathroom or terrace, and the cover is thin. For spalled concrete with exposed steel, the Armstrong specification is an epoxy system in three steps: ROOFBOND EP as the primer, ALSTRONG ZP 777 on the steel, and ROOFCRETE EP as the repair mortar.
A ceiling almost never spalls on its own. Look for the bathroom, balcony or terrace above it. See bathroom waterproofing and terrace waterproofing for the leak that fed the rust.
Most spalled columns, beams, chajjas, balcony edges and dry ceiling patches are rebuilt with a polymer-modified structural repair mortar. The polymer makes the mortar bond, resist shrinkage cracking and keep water, chlorides and carbon dioxide away from the steel, which a plain cement and sand patch does not do. This is Armstrong's reinstatement sequence: steel primer, bond coat, repair mortar placed while the bond coat is tacky, and curing straight away.
A chajja or balcony slab is thin, exposed to rain on top and rusts from its edge inward. The repair is the same sequence with two extra points. Rebuild the edge against a board fixed as formwork, so the mortar is supported and the profile is true. Then form a drip groove under the edge and waterproof the top, because the water that rusted the edge came from above. For more than about 50 mm of build-up, the ROOFCRETE AR 576 data sheet recommends a polymer-modified reinstatement concrete, made by adding graded aggregate in equal proportion.
Honeycombing is concrete with voids left by poor compaction. It is a defect from casting, not from rust, but it gives water and air a direct path to the steel. Shallow honeycombs are cut back to sound concrete and rebuilt with ROOFCRETE AR over a bond coat. Deep honeycombs and voids that run into the member are pressure grouted with a non-shrink grout made with RAPIDSTRONG GROUT ADMIX at 250 g per 50 kg of cement. See injection grouting for the method. A dormant structural crack with no rust is bonded by injecting RAPIDSTRONG GROUT EP 403.
When the damage is too large or too deep to trowel, the repair is cast. Formwork is fixed around the member and a micro concrete is poured or pumped in. Micro concrete is a pre-packed, free-flowing, non-shrink concrete with small aggregate. It fills tight spaces around congested steel without a vibrator. This is the route for whole column faces, beam soffits and sides, jacketing and strengthening, and it is always designed by a structural engineer. For beam jacketing with shear connectors, slab strengthening with added steel and retrofitting a whole building, see structural strengthening and retrofitting.
A repair that is not cured cracks. A repair that is cured but left open to the same water spalls again a few years later, often right beside the patch. Three things finish the job.
Spalling is easier to prevent than to repair. Four things at the time of casting help keep water and air away from the steel.
Every product below is a sound choice for the job it is made for. They differ in chemistry, in how deep they can be placed and in the conditions they tolerate. Figures are from Armstrong data sheets and brochures.
Approximate quantities for a ceiling patch of 1 sq.m, about 10.8 sq.ft, broken out to an average depth of 25 mm, with 6 m of 10 mm rods exposed. The volume to fill is 25 litres. Figures are worked out from each product's stated yield, density or coverage. An Armstrong expert confirms the final quantity after seeing the site.
Enter the area and average depth of the repair and the exposed steel. The calculator gives the volume to fill and the steel coating, bond coat, repair mortar and curing compound. Quantities only.
This is an estimate of material only, worked out from each product's stated coverage on a smooth, prepared surface. Rough or porous surfaces use more, so allow about 10% extra. Crack sealing, patch repair, plaster, coving and tiling materials are not included. An Armstrong expert confirms the final quantity after seeing the site.
The steel in the slab is rusting. Rust takes up more room than steel, so it cracks the cover concrete and pushes it off. The usual causes are water from a bathroom, terrace or pipe above, thin cover over the bars, and age. The fallen piece is the last stage of damage that began years earlier.
No. Plaster hides the rods but the steel keeps rusting and the plaster falls again. The loose concrete is removed, the steel is cleaned and coated, a bond coat goes on and the section is rebuilt with a repair mortar.
A system, not one chemical. ALSTRONG ZP 777 protects the steel. ROOFBOND EP or ROOFBOND SBR 401 is the bond coat. ROOFCRETE EP, ROOFCRETE AR or ROOFCRETE AR 576 rebuilds the concrete. ROOFEXCURE WB cures the cementitious mortars.
The bar is exposed all round and cleaned to remove rust and scale. It is then coated with ALSTRONG ZP 777, a zinc-rich primer that also converts and encapsulates adhering rust. ALSTRONG AC and ALSTRONG RC are the other Armstrong coatings for exposed reinforcement.
The one that fits the job. A polymer-modified mortar such as ROOFCRETE AR suits most columns, beams, chajjas and dry ceilings. An epoxy mortar such as ROOFCRETE EP suits spalled ceilings with exposed steel, damp concrete, heavy loads and chemical exposure. An Armstrong expert confirms the choice after seeing the damage.
For ROOFCRETE AR 576, 6 to 25 mm on vertical faces and up to 100 mm in small pockets, and up to 40 mm on horizontal faces, or 100 mm in two or three layers. Beyond about 50 mm a reinstatement concrete with graded aggregate is recommended, and whole sections are cast in micro concrete.
First have a structural engineer assess it. A dormant crack with no rust is injected with epoxy grout. A column with rust stains or spalling is opened up, the steel is treated, and the section is rebuilt with repair mortar or jacketed with micro concrete.
Break out the loose concrete, treat the steel, fix a board as formwork at the edge, apply a bond coat and rebuild with ROOFCRETE AR 576 mortar or ROOFCRETE AR. Cure it, then waterproof the top of the chajja.
Micro concrete is a pre-packed, free-flowing, non-shrink concrete with small aggregate. It is poured or pumped into formwork without vibration. It is used for column jacketing, beam strengthening and repairs too large or too congested to trowel. Armstrong makes ROOFCRETE MC 240, ROOFCRETE PMC 112 and ROOFCRETE PFMC 122.
A non-shrink micro concrete chosen with the structural engineer. ROOFCRETE MC 240 gives above 50 MPa at 28 days. ROOFCRETE PMC 112 adds polymer for low permeability. ROOFCRETE PFMC 122 adds fibres for crack resistance.
That is the normal case. Only the hollow and loose concrete is removed, back to sound material. The steel is treated and the patch is rebuilt. Recasting is needed only when no sound concrete is left.
Yes, with an epoxy system. ROOFBOND EP bonds to damp or dry concrete and ROOFCRETE EP is made for damp and dry surfaces. The leak that keeps the slab damp is still fixed first.
Yes. ROOFCRETE EUW is an epoxy mortar that is mixed above water, placed below water and cures there, reaching above 50 MPa.
Corrosion does not stop on its own. Each piece that falls lets in more water and air, so the rust speeds up and the repair grows. Spalling in a beam, column or slab should be assessed by a structural engineer soon, and falling concrete is also a safety risk to people below.
Yes for beams, columns, large areas of slab, thinned or broken bars, sagging and diagonal cracks. A small, shallow ceiling patch with lightly rusted rods is commonly repaired by the sequence on this page, but a slab also carries load, so have an engineer look if there is any doubt about the steel.
Tell us which member is damaged, how large the area is and whether the rods are exposed. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures concrete spalling repair chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034