Terrace waterproofing stops roof leakage, water seepage and damp ceilings on the top floor, and the right treatment depends on the state of the terrace. Most leaking terraces are repaired, not rebuilt. Thermal and surface cracks are sealed with a suitable sealant, weak patches are cut out and repaired with polymer mortar, and the waterproofing coating goes on in layers set by the condition of the terrace. Only when no sound surface is left and the slope is wrong is the terrace taken down to the RCC mother slab. Start with the checks below, find your route, and follow it.
Do not buy waterproofing material until the terrace has been assessed. An Armstrong expert confirms the plan first, so you buy only what the terrace needs.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Damp patches on the top-floor ceiling, water seepage down the walls after rain, peeling paint and standing water on the roof are the usual signs of a leaking terrace. Before choosing a terrace leakage solution, find out why it leaks. Five checks decide the treatment. They need no instruments. If the result is unclear, ask for a site assessment before any material is bought.
Tap the surface across the whole roof with a hammer handle or a steel rod. A solid ring means the screed is bonded to the slab. A hollow, drummy sound means the screed has come away and water can travel under it. Mark every hollow, shallow or loose patch. These are cut out and rebuilt, never coated over, because a coating over them fails.
Look at the roof after rain, or pour water on it. Water that stands for hours in several places shows the slope is wrong, and no coating corrects a slope.
Measure the cracks. Fine cracks of 2 to 3 mm are opened and sealed. Cracks wider than that, cracks all over the surface, a crumbling screed, or plants growing through the roof mean the top layers are disturbed. Note the width and where they run: this decides the route and the number of layers.
Note the finish: bare screed, tiles, brickbat coba, old bitumen. Then look at the base of the parapet for a rounded coving and a skirting above it. Where they are missing, the edge is exposed.
Is it used for parties, with crowds and furniture? Is there a roof garden or planters, or a plan for one? Will it be tiled? Heavy use and gardens need a flexible membrane under a protective layer. ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210 and ROOFCOAT PU 2K all suit this, and the coating finder lists them. Use sets the coating. The condition of the terrace sets the number of layers.
Match what you found to one route. There is no single best waterproofing for a terrace, only the one that fits its condition. Each route tells you what is done and takes you to its section.
Repair first, rebuild last. Wherever a sound surface remains, Armstrong repairs it: cracks sealed, bad patches rebuilt, then coated. A rebuild from the mother slab is kept for the terrace that is debonded throughout and cannot hold a patch or a slope.
An Armstrong applicator or distributor checks the surface, the slope and the edges, tells you which route and build-up apply. Armstrong manufactures terrace waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub. Toll free 1800 103 2034.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034
Terrace waterproofing stops roof leakage, water seepage and damp ceilings on the top floor, and the right treatment depends on the state of the terrace. Most leaking terraces are repaired, not rebuilt. Thermal and surface cracks are sealed with a suitable sealant, weak patches are cut out and repaired with polymer mortar, and the waterproofing coating goes on in layers set by the condition of the terrace. Only when no sound surface is left and the slope is wrong is the terrace taken down to the RCC mother slab. Start with the checks below, find your route, and follow it.
Do not buy waterproofing material until the terrace has been assessed. An Armstrong expert confirms the plan first, so you buy only what the terrace needs.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Damp patches on the top-floor ceiling, water seepage down the walls after rain, peeling paint and standing water on the roof are the usual signs of a leaking terrace. Before choosing a terrace leakage solution, find out why it leaks. Five checks decide the treatment. They need no instruments. If the result is unclear, ask for a site assessment before any material is bought.
Tap the surface across the whole roof with a hammer handle or a steel rod. A solid ring means the screed is bonded to the slab. A hollow, drummy sound means the screed has come away and water can travel under it. Mark every hollow, shallow or loose patch. These are cut out and rebuilt, never coated over, because a coating over them fails.
Look at the roof after rain, or pour water on it. Water that stands for hours in several places shows the slope is wrong, and no coating corrects a slope.
Measure the cracks. Fine cracks of 2 to 3 mm are opened and sealed. Cracks wider than that, cracks all over the surface, a crumbling screed, or plants growing through the roof mean the top layers are disturbed. Note the width and where they run: this decides the route and the number of layers.
Note the finish: bare screed, tiles, brickbat coba, old bitumen. Then look at the base of the parapet for a rounded coving and a skirting above it. Where they are missing, the edge is exposed.
Is it used for parties, with crowds and furniture? Is there a roof garden or planters, or a plan for one? Will it be tiled? Heavy use and gardens need a flexible membrane under a protective layer. ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210 and ROOFCOAT PU 2K all suit this, and the coating finder lists them. Use sets the coating. The condition of the terrace sets the number of layers.
Match what you found to one route. There is no single best waterproofing for a terrace, only the one that fits its condition. Each route tells you what is done and takes you to its section.
Repair first, rebuild last. Wherever a sound surface remains, Armstrong repairs it: cracks sealed, bad patches rebuilt, then coated. A rebuild from the mother slab is kept for the terrace that is debonded throughout and cannot hold a patch or a slope.
Armstrong makes acrylic elastomeric, polyurethane (PU), cementitious, rubberised, polyurea and cool roof waterproof coatings for terraces, and all of them are used in layered build-ups. Every one is a sound choice. They differ in chemistry and finish, so the pick depends on the condition of the terrace, how it is used and what you want from it. Answer three questions for a starting recommendation, then confirm it with an Armstrong expert.
{{ resWhy }}
{{ resRecWhy }}
{{ resAlt }}
Before the first layer, remove all loose particles, dust and old flaking coating. Leave 3 to 4 hours between coats. This is a starting point, and an Armstrong expert confirms the final choice after seeing the terrace.
Any of these works as the base coat. Acrylic, polyurethane and cool roof coatings can serve as base or topcoat.
Every coating below suits this build-up. Pick the one that fits your roof and finish, or ask an Armstrong expert to choose with you.
Full terrace waterproofing from the slab up is the extreme option, used only when the surface is debonded throughout, no sound surface is left to repair, and the roof needs a new slope. If part of the surface is still sound, go back to Repair and coat. Each layer here does one job: the membrane sits on the slab, the screed protects it and carries the slope, the coving and skirting close the edges, and the build-up on top takes the weather.
This is the coating route for a terrace whose slab is sound: the existing surface is cleaned, cracks are sealed, and a primer, fibre mesh and elastomeric coats build a seamless, flexible skin over it. It is quicker and lighter than a screed system and suits a slab that will not be walked on heavily. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
Where the old screed is hollow, cracked or holding water, the screed itself is rebuilt, and the waterproofing goes on the mother slab beneath it. The order matters: the membrane is laid on the structural slab, and the new sloping screed is laid over it, so the membrane stays protected and the slope still drains the water to the outlets. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
Doses, thicknesses and the number of coats change with the surface, the exposure and the site. Use this as the standard sequence and adjust it to the job. This build-up is used on terraces and roof sheets where a black bituminous base is wanted under the top coats.
When water leaks, seeps or sweats through porous, honeycombed or cracked concrete, it has to be stopped inside the concrete first. This is the standard negative-side method for tanks, pools, basements, lift pits and retaining walls. A lining laid over concrete that is still seeping is pushed off by the water behind it: it blisters, lifts and fails. Grouting through drilled holes fills the internal voids and capillaries along the path of the water, so the surface is dry and sound before the coating or membrane goes on. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
This is the standard sequence for this area, in the order it is carried out. Each step prepares the surface for the next, so a step skipped or done out of order shows up later as a leak, a blister or a hollow tile. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
The terrace leakage repair route for most homes and buildings. Roof cracks are sealed, sound areas stay, damaged areas are cut out and patched, and the coating goes on last.
Most tiled terraces leak through the joints and the edges, not through the tiles, so terrace leakage can often be treated without removing tiles or breaking the floor. What is done depends on whether the tiles are still bonded to the bed below.
Remove every loose particle, dust, old flaking coating, moss, oil and laitance by wire brushing, grinding or water jetting, and let the surface dry. A coating bonds to whatever is on top, so a layer applied over loose material comes off with it. This applies to every build-up on this page.
A solid ring means the tile is bonded. A hollow sound means it has lifted and water can sit under it. Mark every hollow tile.
Missing, cracked or powdery grout is an open door. Check the joint between the tiles and the parapet as well.
Damp joints days after rain, white salt at the joints or plants growing in them show water held under the tiles.
Tiles themselves do not let water through. The joints do. This method leaves the tiles in place and builds a reinforced waterproof band over every joint.
What to expect. This treats the commonest leak path at a fraction of the disruption of removing the tiles. It does not reach water already trapped under the tiles or a failed layer below them, so Armstrong does not promise it will stop the leak. If the leak continues, the next step is Option 4.
The RAINCARE PRC and RAINPROOF PUF five-layer systems build the same sequence: a primer, fibre mesh, a grey coat, a white fibre-reinforced coat and a reflective top coat. These are the dilutions and consumptions by layer, so the quantity can be worked out before the job. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
How many coats of terrace waterproofing are needed? The condition of the terrace decides the number of layers. The coating in each layer is a separate choice, made by roof and finish. The diagrams show the layers as they sit on the roof, numbered in the order they are applied. Fibre mesh is always layer 2.
Remove every loose particle, dust, old flaking coating, moss, oil and laitance by wire brushing, grinding or water jetting, and let the surface dry. A coating bonds to whatever is on top, so a layer applied over loose material comes off with it. This applies to every build-up on this page.
A bonded surface that drains, with few fine cracks.
Many cracks, a roof that moves, or old bitumen below.
A terrace in bad condition, or a rebuilt one where a long life is needed.
The alternative where the damage is heavy and there is no option to rebuild the terrace. Two layers of mesh. This is also the layer order of the RAINCARE PUA 7 Layer System.
Bonds to the prepared surface, seals its pores and gives the mesh a wet bed.
Carries movement across cracks and joints, so the coating stretches over a wide area and does not tear at one line.
Buries the mesh completely and builds the thickness of the membrane.
Take the sun, rain and foot traffic. Two coats at right angles close the pinholes one coat leaves. White topcoats also reflect heat.
The number of layers and the coating are two separate choices. Any base coat can be used in a two, three, five or seven-layer build-up, and so can any topcoat. Leave 3 to 4 hours between coats. RAINSEAL 200, RAINSEAL FRC 623, RAINSEAL CFR 613, RAINSEAL RWC 902, RAINSEAL CLEAR 202 and the RAINSEAL BMW 250 base coat can each be thinned with up to 20% water.
RAINSEAL BMW 250, RAINSEAL RWC 902, RAINPROOF PRG 909 or RAINPROOF PU 400 are the usual base coats. Armstrong's acrylic, polyurethane and cool roof coatings can also serve as the base. RAINSEAL BMW 250 is used in two, three, five and seven-layer build-ups alike.
Any Armstrong elastomeric coating (RAINSEAL 200, RAINSEAL FRC 623, RAINSEAL CFR 613), a polyurethane (RAINPROOF PU 400, RAINPROOF PRG 909) or a cool roof coating (SUMMERSHIELD COOL 666, SUMMERPROOF COOL 644). Each of these can also be used as a base coat.
Five layers on a terrace in bad condition: RAINSEAL BMW 250, fibre mesh, RAINSEAL BMW 250, then two coats of RAINSEAL 200.
All of these are used as layers in a build-up. None is a lesser product. The table shows what each family is chosen for.
Besides the build-ups an applicator assembles on site, Armstrong offers eight named systems in which every layer is specified: primer, base coats, reinforcing mesh as layer 2 and topcoat. Engineers specify them by name. Each links to its own page with the full layer list.
RAINSEAL HFC or RAINCARE PRC 5 Layer System.
RAINPROOF PBR or RAINPROOF PUF 5 Layer System, both listed for high-traffic terraces.
RAINCARE BRC 6 Layer System, heat reflective.
A roof has more than slab. Rain-water gutters, wooden decks and pergolas, and iron pillars all leak or rot at their own weak points, and each takes the same family of coatings. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
Roof leakage starts at the parapet wall junction, drain outlets and pipe openings far more often than in the open field. These seven details apply on every route.
A rounded fillet at the slab and parapet corner, in mortar with ROOFBOND SBR 401 and CONPROOF LW 200. IS 3067 gives a 75 mm radius. Without it the coating thins and splits at the sharp angle. The usual practice is a 1:4 cement-sand cove up to 6 inches (150 mm) over a ROOFBOND SBR 401 bond coat, mixed with CONPROOF LW 200 at 200 ml per 50 kg of cement.
A waterproofed mortar band along the parapet base, over the upturned membrane. It is the added protection at the edge that takes the most movement and the most water. The usual practice is a 20 mm mortar band, 1:3, mixed with CONPROOF 500 at 500 ml per 50 kg bag, up to 300 mm.
The top of the parapet is capped with a coping in stone, tile or waterproofed mortar, sloped towards the terrace and projecting past the wall face. The groove under the projection, the drip, makes water fall clear of the wall.
The membrane climbs the wall and ends in a groove, never on a flat face. IS 3067 takes it at least 150 mm above roof level.
Water must reach the outlet on its own. Outlets sit at the low points, and the membrane is dressed into the mouth of each one.
Every pipe, railing post and tank leg through the roof is grouted with a non-shrink grout made with RAPIDSTRONG GROUT ADMIX and coated around, with mesh at its base.
Joints are built to move. They take ROOFEX-SEAL PS polysulphide sealant, never mortar, and are not buried under screed.
Approximate quantities from each product's stated coverage, for 1,000 sq.ft (93 sq.m). Rough surfaces use more. Upturns, coving and skirting are extra. An Armstrong expert confirms the final quantity after seeing the site.
Enter the size of your terrace and choose a build-up to see how much waterproofing material it needs. The calculator gives quantities only. Use the button at the end to talk to an Armstrong expert about your quantity.
This is an estimate of material only, worked out from each product's stated coverage on a smooth, prepared surface. Rough or porous surfaces use more, so allow about 10% extra. Crack sealing, patch repair, coving and tiling materials are not included. An Armstrong expert confirms the final quantity after seeing the site.
No single chemical does the whole job. Cracks are sealed with ROOFEXSEAL PU 212, damaged patches are rebuilt with ROOFCRETE AR 576, and the waterproof coating goes on in layers with fibre mesh as layer 2. The coating can be acrylic elastomeric, polyurethane, cementitious, rubberised or bituminous. An Armstrong expert helps you pick the one that suits the roof.
Remove all loose and old material and clean the surface. Seal the cracks and expansion joints. Cut out and patch the damaged areas. Form the coving and skirting at the parapet. Apply the base coat, lay the fibre mesh as layer 2, then the remaining coats. Let it cure and pond test the roof before use.
Rainwater is entering through the terrace above: usually through cracks, open tile joints, the junction of the floor and the parapet wall, or around the drain outlets. Water also stands and soaks in where the slope is poor. The five checks at the start of this page show which of these applies to your roof.
A roof slab moves with heat every day. A rigid filler or a thin coat of waterproof paint cracks again along the same line. The crack needs a flexible polyurethane sealant, and the coating over it needs fibre mesh and enough stretch to move with the roof. RAINSEAL FRC 623 is a fibre reinforced coating suited to roofs that move.
On a new roof, an integral waterproofing compound such as CONPROOF LW 200 is mixed into the screed, the slope and the coving are formed correctly from the start, and a layered waterproof coating is applied over the cured surface.
Rarely. Wherever a sound surface remains, it is repaired: cracks sealed with ROOFEXSEAL PU 212 and bad patches rebuilt with ROOFCRETE AR 576, then coated. The layers come off down to the mother slab only when the surface is hollow across the whole roof and cannot hold a patch or a slope.
The condition decides. Two layers on a sound terrace, three where the roof is cracked or moves, five where it is in bad condition, and seven where the damage is heavy and there is no option to rebuild the terrace. Fibre mesh is always layer 2. Your answers give a minimum build-up, and the next one up is recommended for superior protection. Any Armstrong base coat and topcoat can be used at each count.
Not always. If the tiles ring solid, the joints are regrouted and sealed, or given the Armstrong joint band treatment: a reinforced band of coating over every joint, with the tiles left visible. If many tiles sound hollow or water is trapped under them, they come off and the terrace is rebuilt from the mother slab.
The structural RCC roof slab itself, under the screed, coba or tiles. In a rebuild, the waterproofing membrane is applied directly on it.
The corner between the roof and the parapet moves the most. The coving lets the membrane turn that corner in a curve. The skirting protects the upturned membrane. The coping on top of the parapet, with its drip edge, throws rain clear of the wall so it cannot run down behind the skirting.
There is no single best product. The condition of the terrace sets the number of layers, and the use of the terrace decides the coating. A sound terrace takes two coats of an elastomeric coating. A cracked one takes a base coat, fibre mesh and a topcoat. A terrace in bad condition is patched and given five layers. Only one with no sound surface left is rebuilt.
Both are sound choices. Acrylic elastomeric coatings such as RAINSEAL 200 are UV resistant, breathable and heat reflective, with 450% elongation. Polyurethane coatings such as RAINPROOF PU 400 are the premium choice, with 700% elongation. An Armstrong expert helps match one to your roof.
It reinforces the coating. Bedded into the wet first coat as layer 2, it carries movement across cracks and joints so the coating does not tear along one line.
Yes, where the old layer is sound and firmly bonded. RAINSEAL BMW 250, RAINSEAL RWC 902 and RAINPROOF PRG 909 bond to bituminous surfaces. Loose or blistered felt is removed first.
Yes, if it is built for that use. The membrane, ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210 or ROOFCOAT PU 2K, goes on the slab and is protected by a screed, so soil, planters, furniture and foot traffic never reach it. Tell the applicator about the planned use before work starts.
A white reflective topcoat does. RAINSEAL 200 reflects 80% of solar heat and SUMMERSHIELD COOL 666 reflects 87%. Both are waterproof coatings, so one application does both jobs.
It depends on the coating. RAINSEAL 200 needs 3 days at 30°C before foot traffic or a pond test. Follow the cure time on the data sheet of the product used.
Yes, in a dry spell with no rain forecast for the days the work and curing take, on a surface that has dried. The dry season remains the best time, above all for a rebuild.
An Armstrong applicator or distributor checks the surface, the slope and the edges, tells you which route and build-up apply. Armstrong manufactures terrace waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub. Toll free 1800 103 2034.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034