Balcony waterproofing is a membrane on the slab, turned up the walls and the door threshold and flood tested before tiles, paving or soil cover it. Under tiles, Armstrong ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210, ROOFCOAT PU 2K and ROOFEX 2K 711 are used. Exposed podiums and car park decks take a trafficable five-layer system or a polyurea membrane. A leaking balcony with firm tiles is repaired at the joints and edges first, and the floor is lifted only when that layer has failed.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
A damp ceiling in the flat below, a stain on the underside of the balcony, water creeping under the door into the room, white salt lines at the tile joints: these are the signs of balcony leakage. A balcony or podium is a small roof that people walk on, and its waterproofing is buried under tiles, paving or soil. That is why the membrane has to be right, and proven watertight, before anything covers it. Six checks tell you what kind of repair the balcony needs.
A stain on the ceiling below points to the floor and its joints. Damp on the room floor inside points to the door threshold. A stain along the front of the soffit points to the edge and the railing posts.
Tap every tile with a coin or a hammer handle. A solid ring means the tile is bonded. A hollow sound means it has lifted and water can sit under it. Mark the hollow ones.
Missing, cracked or powdery grout lets water in. Look at the joint between the floor tiles and the wall, and at the skirting tiles.
Pour a bucket of water. It should run to the outlet or spout and leave. Water that stands, or runs back towards the door, shows the slope is wrong.
Look for a step or upstand at the door, and for gaps around railing posts, AC drain pipes and rainwater pipes that pass through the slab.
Cracked or fallen concrete with rusted bars on the underside of the balcony is a structural repair as well as a waterproofing one. See the structural concrete repair page.
Match what you found to one route. Each tells you what is done and takes you to its section. Balconies, podium slabs, car park decks and planters share one rule: the membrane is tested with water before it is covered.
Repair first, break last. Where the tiles are firm, the joints and edges are treated and the floor is left alone. The floor is opened only when the layer under the tiles has failed or the slope is wrong.
Tell us what the deck is, how it is finished and where the damp shows. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures balcony waterproofing chemicals and podium waterproofing systems in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034
Balcony waterproofing is a membrane on the slab, turned up the walls and the door threshold and flood tested before tiles, paving or soil cover it. Under tiles, Armstrong ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210, ROOFCOAT PU 2K and ROOFEX 2K 711 are used. Exposed podiums and car park decks take a trafficable five-layer system or a polyurea membrane. A leaking balcony with firm tiles is repaired at the joints and edges first, and the floor is lifted only when that layer has failed.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
A damp ceiling in the flat below, a stain on the underside of the balcony, water creeping under the door into the room, white salt lines at the tile joints: these are the signs of balcony leakage. A balcony or podium is a small roof that people walk on, and its waterproofing is buried under tiles, paving or soil. That is why the membrane has to be right, and proven watertight, before anything covers it. Six checks tell you what kind of repair the balcony needs.
A stain on the ceiling below points to the floor and its joints. Damp on the room floor inside points to the door threshold. A stain along the front of the soffit points to the edge and the railing posts.
Tap every tile with a coin or a hammer handle. A solid ring means the tile is bonded. A hollow sound means it has lifted and water can sit under it. Mark the hollow ones.
Missing, cracked or powdery grout lets water in. Look at the joint between the floor tiles and the wall, and at the skirting tiles.
Pour a bucket of water. It should run to the outlet or spout and leave. Water that stands, or runs back towards the door, shows the slope is wrong.
Look for a step or upstand at the door, and for gaps around railing posts, AC drain pipes and rainwater pipes that pass through the slab.
Cracked or fallen concrete with rusted bars on the underside of the balcony is a structural repair as well as a waterproofing one. See the structural concrete repair page.
Match what you found to one route. Each tells you what is done and takes you to its section. Balconies, podium slabs, car park decks and planters share one rule: the membrane is tested with water before it is covered.
Repair first, break last. Where the tiles are firm, the joints and edges are treated and the floor is left alone. The floor is opened only when the layer under the tiles has failed or the slope is wrong.
Armstrong makes membranes that go under tiles and soil, and systems that stay exposed under traffic. Every one is a sound choice. Answer three questions for a starting point, then confirm it with an Armstrong expert.
{{ resWhy }}
Before any product goes on, remove all loose, old and flaking material. This is a starting point, and an Armstrong expert confirms the final choice after seeing the site.
Every product below suits this job. Pick the one that fits the site, or ask an Armstrong expert to choose with you.
Water seeps into a slab around pipes and along floor joints, where the original concrete never bonded to the pipe or the next pour. Packing the bore closes that path. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
When water leaks, seeps or sweats through porous, honeycombed or cracked concrete, it has to be stopped inside the concrete first. This is the standard negative-side method for tanks, pools, basements, lift pits and retaining walls. A lining laid over concrete that is still seeping is pushed off by the water behind it: it blisters, lifts and fails. Grouting through drilled holes fills the internal voids and capillaries along the path of the water, so the surface is dry and sound before the coating or membrane goes on. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
This is the standard sequence for this area, in the order it is carried out. Each step prepares the surface for the next, so a step skipped or done out of order shows up later as a leak, a blister or a hollow tile. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
Routes A and C: a new balcony, or one stripped back to the slab. The membrane goes on the slab, is turned up the walls and the door threshold, is flood tested, and only then covered. Four Armstrong membranes suit this job: ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210, ROOFCOAT PU 2K and ROOFEX 2K 711. Any of them can be used under tiles. Pick the one that fits the site, or ask an Armstrong expert. RAINPROOF PU 400 is an exposed membrane and is not used under tiles.
Route B. Tiles themselves do not let water through. The joints, the edges and the points where something passes through the floor do. Where the tiles are firmly bonded and the balcony drains, the leak can often be treated from the surface.
Where the old tiles are bonded but worn, TILEX 521 is a two-component adhesive made for fixing new tiles over existing ones, and is listed for balcony tiles. Tiling over old tiles does not waterproof the balcony by itself. Treat the joints and edges first. The tile fixing and grouting page covers adhesive and grout selection.
Routes D and E. A podium slab, a walkway or a parking deck is a large flat roof with people, vehicles or landscaping on it and occupied space below. Some are finished with paving on a screed, and take a membrane under it exactly as a balcony does. Others are left as a coated surface, and then the membrane itself has to take the wear and the sun.
Floor coatings for the inside of a covered car park, as distinct from waterproofing a deck open to rain, are on the epoxy flooring page.
Route F. A planter is a small tank that is never emptied. The soil stays wet, the water carries fertiliser salts, and nobody can see the membrane again once the soil is in. The waterproofing therefore sits on the inside faces, the side the water touches, and is protected before the soil goes in.
Named systems listed for planters: RAINPROOF PHC 5 Layer System for planter boxes, with crack bridging up to 3 mm, and RAINSEAL HFC 5 Layer System and RAINCARE PRC 5 Layer System for planter areas. A garden laid over a whole terrace is covered on the terrace waterproofing page, which uses the same two membranes under a protective layer.
There is no single best waterproofing for a balcony or podium. The first question is whether the membrane will be covered or left exposed. The tables give every Armstrong product that suits each case, with its stated figures. None is a lesser product.
Each five-layer system has four coats and a fibre mesh or geo-fabric as its second layer, and comes in packs of 5 and 20 litres. The second layer is stated as fibre mesh or geo-fabric for all of them.
A balcony 12 ft by 5 ft has 60 sq.ft of floor. With the membrane turned up about 1 ft on 22 ft of wall and threshold, the coated area is about 82 sq.ft (7.6 sq.m). Quantities below are from each product’s stated coverage. The upturn height is an example. An Armstrong expert confirms the final quantity after seeing the site.
Enter the floor size and the upturn to see the membrane and tile adhesive needed. Quantities only.
This is an estimate of material only, worked out from each product's stated coverage on a smooth, prepared surface. Rough or porous surfaces use more, so allow about 10% extra. Crack sealing, patch repair, plaster, coving and tiling materials are not included. An Armstrong expert confirms the final quantity after seeing the site.
No single chemical does the whole job. Cracks are sealed with ROOFEXSEAL PU 212, pipes and posts are grouted with a non-shrink grout made with RAPIDSTRONG GROUT ADMIX, the coving is formed with ROOFBOND SBR 401 and CONPROOF LW 200, and the floor is then coated in two coats with ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210, ROOFCOAT PU 2K or ROOFEX 2K 711, turned up the walls and tested with water before tiling.
A membrane that bonds to the slab and takes a screed or tile bed over it. Armstrong makes four: ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210, ROOFCOAT PU 2K and ROOFEX 2K 711. RAINPROOF PU 400 is an exposed membrane and is not used under tiles.
Water passes through the tile joints or the edges, reaches the slab and travels through cracks, pipe openings and the wall junction to the ceiling below. The stain is often not directly under the point where the water went in.
If the tiles ring solid and the balcony drains: rake out and regrout the joints with an epoxy grout, seal the joint between floor and wall and around posts and pipes with ROOFEXSEAL PU 212, then coat the surface with RAINSEAL CLEAR 202 or RAINCARE PU CLEAR on a completely dry surface and flood test. If many tiles are hollow, the floor has to be lifted.
Yes. The membrane is flooded and held, and the space below checked, before any screed or tile covers it. It is the only proof that the membrane is watertight, and the only point at which a defect is easy to put right.
It is turned up the walls over a coving and up the door threshold, to above the finished floor level. IS 3067 takes roof treatments at least 150 mm above the surface. Ask an Armstrong expert for the height on your balcony, as it depends on the finished floor and the door detail.
Yes, where the old tiles are firmly bonded. TILEX 521 is a two-component adhesive made for tile-on-tile work and listed for balcony tiles. New tiles do not waterproof the floor, so the joints and edges are treated first.
A polymer adhesive that tolerates heat and movement. TILEX 353 is a deformable C2TES1 adhesive for exterior floors, TILEX 351 PLUS is a C2TE adhesive for external tiling and TILEX 521 is an S2 adhesive listed for balcony tiles. See the tile fixing and grouting page.
It depends on the finish. Under paving, a membrane such as ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210 or ROOFCOAT PU 2K goes on the slab. For an exposed podium, RAINSEAL HFC, RAINCARE PRC, RAINPROOF PBR and RAINPROOF PHC 5 Layer Systems are all listed for podium decks. An Armstrong expert helps choose.
Cracks are sealed, hollow patches rebuilt and expansion joints resealed first. The deck then takes a system listed for traffic: RAINPROOF PUF or RAINPROOF PBR 5 Layer System, or a polyurea membrane where the deck must reopen quickly. The work is done in bays so parking continues.
It is treated in sections so part stays in use. RAINPROOF PWR 690 is walkable in 1 to 3 hours and RAINPROOF PHB 660 in 2 minutes, which keeps each closure short.
Empty and clean it, seal the cracks, form a coving at the corners and grout the drain outlet. Apply two coats of ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210 on the base and all inside faces, flood test, protect the membrane with a screed, then add the drainage layer and soil.
A membrane that stays sound under constant damp, on the slab and under a protective layer: ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210. The full terrace sequence is on the terrace waterproofing page.
The principle is the same: a membrane under the tiles, turned up the walls, tested with water. A balcony also takes sun, rain and daily temperature change, so the adhesive, grout and perimeter sealant are chosen for outdoor use. For bathrooms see the bathroom waterproofing page.
That is corrosion of the steel in the slab, and it is repaired as a structural job before or along with the waterproofing: the steel is cleaned and primed with ALSTRONG ZP 777 and the concrete rebuilt. See the structural concrete repair page.
Tell us what the deck is, how it is finished and where the damp shows. An Armstrong applicator or distributor will recommend a system. Toll free 1800 103 2034. Armstrong manufactures balcony waterproofing chemicals and podium waterproofing systems in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034