Bathroom waterproofing is a sequence, not a single coat. In a new bathroom or toilet, the pipe sleeves are grouted, the joints sealed, a cove formed and the sunken slab coated in two coats of ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210, then tested with water before tiling. In a leaking bathroom, the source is found first. Many leaks are fixed without breaking tiles, and the floor is opened only when the layer below has failed. Start with the checks below, find your route, and follow it.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Bathroom leakage and seepage show up somewhere else: a damp patch on the ceiling of the flat below, peeling paint on the bedroom wall, a wet floor outside the door. Bathroom waterproofing works when it deals with the points where water actually gets in, which are the pipe sleeves, the joints, the wall and floor junction and the floor itself. The same applies to a toilet or washroom. Five checks tell you which treatment you need.
Then the floor is leaking: tile joints, the drain or failed waterproofing. Block the drain, flood the floor with a little water for a few hours and check below.
That is a water supply pipe under pressure. Close every tap and watch the meter, or have a plumber pressure-test the line. No waterproofing fixes a leaking pipe.
Suspect the waste pipe, trap or its joint under that basin, shower or WC. Run one fixture at a time and watch from below.
Tap across the floor with a coin and mark the hollow areas. Firm tiles can often stay. Hollow tiles mean water is trapped under them.
This is the best time to waterproof. The full sequence goes on the bare slab and is tested before tiling.
Match what you found to one route. The right repair is the smallest one that reaches the real source.
Diagnose first, repair second. A leaking pipe and a leaking floor look the same from below and need different repairs. Be wary of any promise that every bathroom leak can be fixed without breaking tiles.
Tell us what you see, where the damp shows and how old the bathroom is. An Armstrong applicator or distributor will recommend a treatment. Toll free 1800 103 2034. Armstrong manufactures bathroom waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034
Bathroom waterproofing is a sequence, not a single coat. In a new bathroom or toilet, the pipe sleeves are grouted, the joints sealed, a cove formed and the sunken slab coated in two coats of ROOFCOAT FLEXI 100 or ROOFBOND RFX PLUS 210, then tested with water before tiling. In a leaking bathroom, the source is found first. Many leaks are fixed without breaking tiles, and the floor is opened only when the layer below has failed. Start with the checks below, find your route, and follow it.
By Armstrong Chemicals Pvt. Ltd. · ISO 9001:2015 certified · Protecting buildings, roofs and structures since 1982
Bathroom leakage and seepage show up somewhere else: a damp patch on the ceiling of the flat below, peeling paint on the bedroom wall, a wet floor outside the door. Bathroom waterproofing works when it deals with the points where water actually gets in, which are the pipe sleeves, the joints, the wall and floor junction and the floor itself. The same applies to a toilet or washroom. Five checks tell you which treatment you need.
Then the floor is leaking: tile joints, the drain or failed waterproofing. Block the drain, flood the floor with a little water for a few hours and check below.
That is a water supply pipe under pressure. Close every tap and watch the meter, or have a plumber pressure-test the line. No waterproofing fixes a leaking pipe.
Suspect the waste pipe, trap or its joint under that basin, shower or WC. Run one fixture at a time and watch from below.
Tap across the floor with a coin and mark the hollow areas. Firm tiles can often stay. Hollow tiles mean water is trapped under them.
This is the best time to waterproof. The full sequence goes on the bare slab and is tested before tiling.
Match what you found to one route. The right repair is the smallest one that reaches the real source.
Diagnose first, repair second. A leaking pipe and a leaking floor look the same from below and need different repairs. Be wary of any promise that every bathroom leak can be fixed without breaking tiles.
Armstrong makes flexible cementitious, polyurethane-cement and crystalline waterproofing coatings for bathrooms, along with the grouts, sealants, repair mortars and tile adhesives that go with them. Every one is a sound choice. They differ in chemistry and finish, so the pick depends on the bathroom and the leak. Answer three questions for a starting recommendation, then confirm it with an Armstrong expert.
{{ resWhy }}
This is a starting point. An Armstrong expert confirms the final choice after seeing the bathroom.
Each product below suits this job. Pick the one that fits the bathroom, or ask an Armstrong expert to choose with you.
In a bathroom, the waterproofing goes on the slab and the plaster and screed go over it, so the membrane is protected and the floor still falls to the trap. This is the order for a floor that will be tiled. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
Water seeps into a slab around pipes and along floor joints, where the original concrete never bonded to the pipe or the next pour. Packing the bore closes that path. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
When water leaks, seeps or sweats through porous, honeycombed or cracked concrete, it has to be stopped inside the concrete first. This is the standard negative-side method for tanks, pools, basements, lift pits and retaining walls. A lining laid over concrete that is still seeping is pushed off by the water behind it: it blisters, lifts and fails. Grouting through drilled holes fills the internal voids and capillaries along the path of the water, so the surface is dry and sound before the coating or membrane goes on. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
This is the standard sequence for this area, in the order it is carried out. Each step prepares the surface for the next, so a step skipped or done out of order shows up later as a leak, a blister or a hollow tile. Doses, thicknesses and coats are the standard figures; the site and the exposure decide where they move.
Bathroom and toilet waterproofing in a new building is done on the bare slab, before tiling closes everything up. It is a sequence of treatments, not one coat at the end. Pipe sleeves, joints, the wall and floor junction and the floor itself each fail differently, so each gets its own step.
The companion article bathroom waterproofing: why the sequence matters explains each stage.
Bathroom leakage can be fixed without breaking tiles when the leak is through the tile joints, around the floor drain or around fittings, the tiles are firm, and the pipes have been ruled out. It cannot fix a leaking concealed pipe or failed waterproofing under loose tiles.
This is the full repair for a leaking bathroom. A sunken bathroom is a slab dropped below floor level and filled, with the trap and pipes buried inside. Once water gets into that filling it sits there and finds the weakest point in the slab. The rebuild removes everything down to the slab, fixes what is found, and builds the floor back in the right order.
When water is coming through now, stop using the bathroom, find the source and stop the water first. These products are made to set against running water. A plug stops the water you can see. It does not replace the waterproofing.
The coating under the tiles is the main barrier in bathroom waterproofing. It goes on the slab, over the cove, and up the walls. Armstrong makes several, and each is a sound choice. They differ in chemistry and finish, and an Armstrong expert helps you pick.
Standing water and splash do not stay on the floor, so the coating goes up the walls over the cove. The height depends on how much water each wall sees. All heights are measured from finished floor level.
Where the whole bathroom is small and the shower wets every wall, take all walls to 2,000 mm. Carry the coating across the door threshold as well, so water cannot pass under the frame. The cove at the wall and floor junction is formed first, and IS 3067 gives a 75 mm radius for that fillet.
Approximate quantities for the coating only. The floor is 40 sq.ft and a 300 mm upturn on all four walls adds about 26 sq.ft, so about 66 sq.ft in all. Taking one 5 ft shower wall up to 2,000 mm adds about 28 sq.ft more, so allow in proportion. Figures are worked out from each product's stated coverage. An Armstrong expert confirms the final quantity after seeing the site.
Enter the size of your bathroom and choose a coating to see how much waterproofing material it needs. The wall heights follow the table in Choosing the coating: 2,000 mm in the shower, 1,000 mm behind the basin and taps, 300 mm elsewhere. The calculator gives quantities only. Use the button at the end to talk to an Armstrong expert about your quantity.
This is an estimate of material only, worked out from each product's stated coverage on a smooth, prepared surface. Rough or porous surfaces use more, so allow about 10% extra. Crack sealing, patch repair, coving and tiling materials are not included. An Armstrong expert confirms the final quantity after seeing the site.
No single chemical does the whole job. Pipe sleeves are grouted with a non-shrink grout made with RAPIDSTRONG GROUT ADMIX, joints are sealed with ROOFEXSEAL PU 212, the cove is formed with ROOFBOND SBR 401 and CONPROOF LW 200, and the floor and lower walls are then coated in two coats with ROOFCOAT FLEXI 100, ROOFBOND RFX PLUS 210 or ROOFCOAT PU 2K.
Sometimes. If the leak is through the tile joints, around the floor drain or around fittings, and the tiles are firm, raking out the joints, regrouting with an epoxy grout such as TILEX EPOXY STAIN FREE 100 and sealing with ROOFEXSEAL PU 212 can stop it. It cannot fix a leaking concealed pipe or failed waterproofing under loose tiles. Those need the floor opened.
Watch when the damp appears. If it grows after baths, the floor is leaking: block the drain, flood the floor for a few hours and check below. If it drips when nobody has used the bathroom, a supply pipe is leaking. If it drips only when one fixture is used, suspect that fixture's waste pipe or trap.
Under tiles, use a coating made for wet areas, applied to the slab and turned up the walls. ROOFCOAT FLEXI 100 and ROOFBOND RFX PLUS 210 are flexible polymer cementitious coatings for bathrooms, toilets and sunken slabs. ROOFCOAT PU 2K is a polyurethane-cement membrane with nil water penetration at 5 bar. Test the coating with water before tiling.
Clean the slab, grout the pipe sleeves, seal the joints and cracks, form the cove at the wall and floor junction, apply the waterproof coating in two coats up the walls (2,000 mm in the shower, 300 mm minimum elsewhere), pond the floor with water for 7 days, lay the waterproof base plaster, then tile and grout.
A sunken slab is the bathroom floor slab dropped below the level of the rooms around it so the pipes and trap can be buried. It is waterproofed on the slab and up its sides before the filling goes in, because once water reaches the filling it stays there.
Coving is a rounded cement plaster fillet at the corner where the wall meets the floor. A sharp right angle concentrates stress and is where a flat coating thins out. The cove removes that corner, and the integral waterproofing compound in it makes the junction waterproof through its thickness.
From finished floor level: 2,000 mm on the shower walls, 1,000 mm on the walls behind the basin, taps and bathing area, and at least 300 mm on all other walls, including a separate toilet. These follow IS 13182. In a small bathroom where the shower wets every wall, take all walls to 2,000 mm.
The coated floor is flooded and the water is held, 7 days in Armstrong's sequence. It is the only way to confirm the waterproofing is watertight before the tiles cover it.
Stop using the bathroom and find the source. Close all taps and check whether the dripping continues, which points to a supply pipe. If water is coming through a visible point, a plugging compound such as RAPIDSTRONG PLUG 31, which sets in 30 seconds, can stop it while the proper repair is planned.
Usually because a step before the coating was skipped: an unsealed pipe sleeve, an untreated joint, or a sharp wall and floor corner with no cove. A coating over an untreated weak point fails at that point.
In wet zones, yes. Cement grout is porous and lets water through to the bed below. TILEX EPOXY STAIN FREE 100 is a 100% epoxy grout that is stain-free and resists chemicals. Where cement grout is used, add TILEX URP ADMIX 73.
It depends on the repair. Cement grouts need 24 to 48 hours before they see water. Tiles fixed with TILEX 351 PLUS need a minimum of 24 hours before grouting. A full rebuild takes longest: ROOFCOAT PU 2K needs at least 3 to 5 days of air curing before the water test, and the screed, tiles and grout follow after that.
Yes. Any wet area with pipes through the slab and tiles on top is waterproofed in the same order.
Tell us what you see, where the damp shows and how old the bathroom is. An Armstrong applicator or distributor will recommend a treatment. Toll free 1800 103 2034. Armstrong manufactures bathroom waterproofing chemicals in Bengaluru and supplies them all across India, with South India as its major hub.
Written by the technical team at Armstrong Chemicals Pvt. Ltd., an ISO 9001:2015 certified manufacturer of construction and waterproofing chemicals in Bengaluru, with more than 200 products. Armstrong has been protecting buildings, roofs and structures since 1982 and supplies all across India, with South India as its major hub.
The methods on this page are Armstrong's standard procedures. Doses, thicknesses and the number of coats are adjusted to the conditions on each site. Load-bearing repairs and strengthening are designed by a structural engineer.
Last updated · Questions on this method: toll free 1800 103 2034