Skip to main content
    Technical Reference

    Treatment Procedures.

    Step-by-step waterproofing, structural repair and rehabilitation methods, grouped by the chemistry they use, each mapped to the Armstrong products that carry it out. Select a treatment to view the full procedure and product recommendations.

    Treatment · Integral, curing & damp-proofing

    Curing Compound Application

    Membrane curing for slabs, repairs and floors

    New slabs and pavementsRepair mortar and polymer concreteFloor hardener surfacesWhere water curing is difficult
    1. Spray the curing compound as soon as the surface water has gone, or immediately after finishing a repair or floor.
    2. Hold the nozzle about 450 mm from the surface and apply an even film.
    3. Cover the whole surface, including edges.
    4. Keep traffic off until the concrete has gained strength.

    Do not use a membrane curing compound on a crystalline coating or where a coating must bond later without removing it.

    A curing compound forms a film that keeps the mixing water in the concrete while the cement hydrates, reducing shrinkage cracks and water use. IS 456 asks for at least 7 days of moist curing with ordinary Portland cement.

    ROOFEXCURE WB4 to 5 sq.m per litre (per kg) per coat

    Need this for your project?

    Technical support and product recommendations from Armstrong's engineers. Toll free 1800 103 2034.

    Call usTalk to an expert